In spring 2008 Council proposed an amendment to the 2006 Long-term Council Community Plan (LTCCP) to upgrade Trafalgar Park. This page explains the original proposal
Read the decision made by Council on 23 October.
Nelson City Council proposes to upgrade the facilities at Trafalgar Park at an estimated cost of $7 million in order to enable high attendance events including major rugby matches to be held there. Work is planned to begin after July 2009.
The proposed upgrade of Trafalgar Park facilities is a significant project. This statement of proposal is to draw residents’ attention to a significant change to what had previously been planned by Nelson City Council. So it can proceed, the community facilities section of the previous 2006 LTCCP has to be amended following consultation with the community, as required by the Local Government Act 2002. Subsequent changes to Council finances will be included in the 2009 LTCCP, which becomes operative from 1 July 2009 and replaces the 2006 LTCCP.
$800,000 was included in Council’s 2008/09 Annual Plan to cover the planning costs for the upgrade in the current financial year.
The Nelson City Council’s Trafalgar Park development proposal includes:
Note: No additional permanent seating structures are included in this proposal.
Diagrams of the proposal are attached.
This option has been chosen because it will allow large-scale events to be held but will not limit future development occurring. Event needs will be met with temporary facilities hired for specific occasions. No expensive long-term permanent structures that could limit or obstruct future development would be built as a result of this proposal. The old east grandstand will be removed to allow for up to 6,000 temporary seats to be hired. Opportunities for future partnership arrangements for joint development along the Trafalgar Street frontage still remain. The estimated cost of the proposed option is approximately $7 million compared to $20 million for an alternative option. Neither of these options would provide permanent seating on the Trafalgar Street side of the ground.
The Council considered a range of development options for the future of Trafalgar Park – all options, apart from option 1 which is a “do nothing” option would be funded by loan , the cost of the loan would be determined when the funds are borrowed, but is expected to be 8% per annum.
Option 1. Consideration was given to leaving the park as it was and not developing it further at this time. The disadvantages of this option include Trafalgar Park not being capable of hosting major rugby events. There would be no new costs for this option and Council would not spend the $800,000 set aside for the planning costs in 2008/09.
Option 2. Council considered upgrading the playing surface for local and some representative fixtures by raising the ground level and reconstructing the field on a sand carpet with a slot drainage system at an estimated cost of $2m. The cycling track would be removed.
The disadvantages of this option are that the Park would not have met the 20,000 capacity requirements for major rugby events. Nelson would still lack a quality outdoor events facility and this would decrease the potential opportunities for economic benefit for the region. The appearance of the entrance to the City would not be enhanced. This option would only require $200,000 of the $800,000 provided for in 2008/09 for the planning costs of this project.
Option 3. This included the work included in Option 4 as well as moving the field to the north and west and constructing additional permanent seating for 3,500 at an approximate cost of $20 million. The disadvantage of this option is the $13 million additional cost compared to the preferred Option 4.
Option 4. This is the Council’s preferred development option and the option on which the Nelson/Tasman Regional Funding Forum based its recommendations for a funding split for the Nelson and Tasman Councils. This option meets the 20,000 capacity requirements for major rugby events by enabling the provision of temporary facilities yet still enables the development of permanent facilities in future. It is described in ‘Details of the Proposal’ above.
| Option 1- 'do nothing' | Option 2- $2 mil | Option 3- $20 mil | Option 4- $7 mil | |
|---|---|---|---|---|
|
$000
|
$000
|
$000
|
$000
|
|
| Loan costs (interest and principle) |
N/a
|
210
|
2,100
|
735
|
| Depreciation |
N/a
|
26
|
410
|
150
|
| Maintenance costs |
N/a
|
40
|
340
|
70
|
| TOTAL |
N/a
|
276
|
2,850
|
955
|
| Impact on rates per annum - including water rates |
N/a
|
0.59%
|
6.05%
|
2.03%
|
| Impact on rates per annum - excluding water rates |
N/a
|
0.76%
|
7.87%
|
2.64%
|
Notes on the costings:
| Sand based turf | $700,000 over 40 yrs |
$17,500
|
| Ground drainage | $700,000 over 80 yrs |
$8,750
|
| Toilets/buildings | $1,600,000 over 50 yrs |
$32,000
|
| Sports and general lighting | $1,800,000 over 25 yrs |
$72,000
|
| Scoreboard | $100,000 over 15 yrs |
$6,667
|
| Embankment | $700,000 over 80 yrs |
$8,750
|
| Total |
$150,000
|
There will be ongoing additional maintenance costs depending on option, for example option 4 will require an additional $40,000 per annum for the sand carpet and drainage system and $30,000 for general maintenance including the additional toilets.
The preliminary estimated cost of the development as proposed is $7 million. The Nelson/Tasman Regional Funding Forum has recommended to both the Nelson City Council and the Tasman District Council that the project is a regional facility and should be funded by both Councils, together with a third party representing the users of the park. It is usual with the development of recreational facilities that users contribute at least 20% of the development costs.
In this case funding from a third party might not be forthcoming and Tasman District Council has deferred its decision until its 2009 LTCCP process. In order to make a decision to meet the time requirements for placing a bid to host a possible game for the forthcoming Rugby World Cup in 2011 Nelson City Council might have to consider funding the total costs at this time with no guarantee of support from Tasman ratepayers or a third party representing facility users.
Traditionally, large events have added much to the character and economy of Nelson. Older Nelsonians remember the early days of celebrating the New Year at the Central Post Office. Many remember when Peter Snell ran at Trafalgar Park on grass. Super 12 Games were a highlight. There is still excitement over Super 14, and Kiri Te Kanawa singing at the 2008 Opera in the Park will long be remembered. It is considered an important part of a community’s identity to have a high quality outdoor venue for such events.
A disadvantage of this proposal is the removal of the cycling track, a venue for competition and a training ground for young cyclists.
Tangata whenua ō Whakatu are to be consulted to ensure any cultural issues are taken into account.
Wherever possible environmental features will be built into the Park. Water for toilet flushing will be collected from rain water, the latest methods for heating showers will be considered. Run-off from carparks will be filtered through rain gardens where practicable and spectators will be encouraged to arrive and leave by public transport.
Events potentially bring economic benefits, particularly those that draw visitors from outside the region. Nelson has been missing out on this activity in recent years and the development of Trafalgar Park will draw more visitors and encourage Nelsonians to spend on events held locally, rather than having to travel outside the region.
The cost of the entire $7 million capital expenditure is $735,000 per annum which will increase rates by approximately 2.03% including water rates and or 2.64% excluding water rates This is considered affordable by the Council and will not impact on other planned projects in the 2006 LTCCP.
Council consulted on a proposed upgrade of facilities at Trafalgar Park in 2005 on the basis that the Tasman District Council and Tasman Rugby Union would contribute funding. This funding did not eventuate as the Tasman Rugby Union were not in a financial position to contribute and the Tasman District Council decided that it would purchase temporary seating that could be used not only at Trafalgar Park but elsewhere in the Nelson/Tasman Region. The amendment proposed for the 2006 LTCCP is to include the following text on page 162 of volume 1:
Delete: the following sentence in the section on Trafalgar Park “Council has decided to contribute $1.564 million, with Tasman District Council expected to contribute $0.635 million and Tasman Rugby Union $0.870 million”
And Replace with: “Council developed new stands on the west side of Trafalgar Park costing $1.56 million”.
Page 168 of the 2006 LTCCP will also be amended:
Delete: The final two sentences of the first paragraph under the heading h. Regional facilities, reading “Nelson residents were recently consulted on a proposed upgrade of the rugby facilities at Trafalgar Park. Subject to Tasman District Council finance, the work will proceed during the 2006/07 financial year.
And replace with: “In late 2005 Nelson residents were consulted on a proposed upgrade of the facilities at Trafalgar Park, following which $1.56 million was spent on developing the grandstands. Following further consideration and consultation in 2008 Council has decided to spend up to $7 million on a facilities upgrade at Trafalgar Park to enable it to be used for high attendance events including major rugby matches. Work on the upgrade is planned to begin after 1 July 2009. The 2009 LTCCP will reflect this decision. The amount may be lower if TDC and sponsorship funding is obtained.”
The performance measure for the project will be development of the grounds on time and within budget.
An amendment to the LTCCP would normally require a separate published summary of the proposal, however given the short length of this amendment no summary is considered necessary. Submissions in response to this Statement of Proposal were invited through 13 October, but have now closed.
When discussing the development of Trafalgar Park, it is useful to put the proposal in context with the other large projects that are included in the 2006 – 2016 LTCCP. While many of these projects are still in the early planning stages, the following gives an idea of the possible costs associated with them.
|
Option 1- $0
|
Option 2- $2m
|
Option 3- $20m
|
Option 4- $7m
|
|
|---|---|---|---|---|
| Cycletrack retained |
x
|
|||
| Cricket wicket retained |
x
|
|||
| Lights for night games and spectator security |
x
|
x
|
||
| Support hosting regional rugby events |
x
|
x
|
x
|
x
|
| Support Super 14 rugby games |
x
|
x
|
x
|
|
| Support RWC guidelines for hosting a team |
x
|
x
|
||
| Support RWC guidelines for hosting a game |
x
|
x
|
||
| Improved playing field |
x
|
x
|
x
|
|
| Improved pavilion and player facilities |
x
|
x
|
||
| Embankment remodelled |
x
|
x
|
||
| More permanent seating |
x
|
|||
| Sufficient permanent seating for major events | ||||
| Entrance ways and ticketing improved |
x
|
x
|
x
|
|
| Electronic scoreboard |
x
|
x
|
||
| More permanent toilets |
x
|
x
|
||
| Major additional cost |
x
|
x
|
||
| Enhance the city's entrance |
x
|
x
|
For more information, contact Manager Community Projects, +64 3 546 0240.